RECONSTRUCTION OF THE RIGHT EMBANKMENT OF THE MAŁA WISŁA RIVER
Scope of works:
lifting of the existing embankment by max. 1.34 m, its development on the inter-embankment side and compaction within the length of 0.650 km,
reconstruction of the box and circular embankment culvert at km 2+086 dimensions: 0.7 x 1.1 m) together with a correction of the slope of the ditch bottom from the outlet to the mouth on the left bank of the Mała Wisła river,
reconstruction of the three embankment crossings at km: 1+972, 2+175, 2+552,
local macro-levelling of the site,
hardening of the embankment crest together with the embankment crossings, planting,
covering with humus and sowing embankment slopes,
recovery of the geodetic control network points and location markers,
constructing service road along the embankment,
maintenance and repair of access roads to the embankment.