Modernisation of the electrical power and heating station along with the project.
Electrical power and heating station equipped in:
2 utility boilers,
generator 17,5 MVA/6,3 kV.
Scope of works:
the switchboard RGNN 4-section, 22-filed, 2 SZR, 2500A
fields of the main switchboard LV
power take off of the generator 6kV
three-phase power system installations
lightning installations
fire protection system installation
phone instalation
social building